BOILER
- Reviewing operating parameters
- Performance study at Steady load for max 4 hrs
- Checking parameters in field and DCS
- Sampling of Fuel, Fly Ash and Water
- Efficiency calculation by in-direct method
- Checking Radiation loss by using Thermo Graphic Camera
- Checking Air ingress by using portable Gas analyser
- Blow down optimization based on Water Quality
- Pressure Drop Study
- Submission of Detailed report
TURBINE
- Review of PG test Parameters carried out by OEM
- Review of present operation parameters
- Review and Fine-tuning HP & LP heaters
- Performance study at Steady load for max 4 hrs
- Monitoring the performance Parameter as per OEM
- Heat Rate calculation
- Submission of detailed report
CONDENSOR
- Checking Air / Water flow by using necessary instruments
- Review of Temperature at Air & Steam / Water side
- Checking air ingress at Bundles
- Evaluation test
- Submission of detailed report
ASH HANDLING PLANT
- Reviewing the present cycle timings
- Necessary calculation as per fuel requirements
- Optimization of cycle timings
- Power saving calculation
- Submission of detailed report
COMPRESSOR
- Reviewing the present Air Flow
- Comparing present Air flow with design Air flow
- Performance evaluation calculation
- Submission of detailed report
ELECTRICAL EQUIPMENTS REVEIW
- Review of parameters for Boiler auxiliaries (Fans & Pumps)
- Individual Efficiency calculation for all Fans & Pumps
- Review of cable & Transformer losses
- Submission of detailed report